Pine Level WWPS Upgrade

Pine Level WWPS Upgrade

UPDATED: February 5, 2026

  • Contractor: AC Schultes of Carolina, Inc.
  • Construction Contract: $1,251,308
  • Project Completed On: May 1, 2025
  • Description: This project involved the replacement of existing pumps, piping, a standby generator, electrical components, and related appurtenances. The project increased the pump station's operational capacity from 700 gallons per minute (GPM) to 1,000 GPM. The work included pump and piping replacement, wetwell rehabilitation, installation of a backup generator and automatic transfer switch, and all necessary electrical and control equipment, including SCADA system integration. 
  • Map


Pipe Icon