Holt Lake Force Main and WWPS Upgrade

UPDATED: July 29, 2025

The work consists of installing approximately 4,272 LF of 8” force main from the Holt Lake Sewer Pump Station to a cut-in 5’ diameter manhole adjacent to S. Brightleaf Boulevard. The proposed 5’ diameter manhole will be cut into an existing 12-inch truss pipe with CIPP liner gravity sewer line that runs parallel to S. Brightleaf Boulevard. The Holt Lake WWPS will be upgraded to 700 GPM. Upgrades to the station will include a new generator pad and retrofit of the existing wet well.



Pipe Icon
CONTACT

rudy.wells@johnstonnc.gov
Project Engineer

Project Completed On:
June 1, 2024