Four Oaks WWPS and EQ Upgrade
Improving sewage management within the Town of Four Oaks
UPDATED: May 29, 2025
Located in the Town of Four Oaks, the work generally consists of:
- Constructing a new 880 gpm triplex submersible sewage effluent pumping station wet well with valve vault and flow meter vault.
- Conversion of the existing pump station into an electrical building.
- Addition of a sewage grinder in an existing influent wet well.
- Addition of liquid chemical feed system for odor control.
- Approximately 100 linear feet of 12- and 16-inch gravity sewer and 40 linear feet of 30-inch diameter bored-and-jacked steel casing at the existing pumping station site.


CONTACT
Project Started On:
December 1, 2023
Page last updated: May 29, 2025