Cleveland K-5 WWPS Diversion
Bypassing a pump station for greater efficiency
UPDATED: August 14, 2025
The Cleveland K-5 WWPS Diversion:
- installed a 4-foot diameter manhole and approximately 78 linear feet (LF) of 8-inch PVC gravity sewer pipe, and
- abandoned portions of an existing system to bypass a pump station.


Page last updated: August 14, 2025