
Smithfield North Booster Pump Station Upgrade
UPDATED: July 29, 2025
The work will be located at the existing Smithfield North Booster Pump Station Site located at 3145 Buffalo Road
in Smithfield, North Carolina. The project will consist of the construction of approximately:
• Demolition of the existing Smithfield North Booster Pump Station, generator, and associated equipment.
• Installation of a new 1.5 MGD pre-packaged duplex booster pump station, generator, site improvements, yard
piping, structural works including new slabs for pump station and generator, electrical and SCADA upgrades,
erosion control, testing, site restoration, and other appurtenances.


CONTACT
Project Completed On:
December 1, 2024
Page last updated: July 29, 2025